Straight answers on costs, permits, and timelines.
- Home
- Resources
Homeowner Guides
These guides answer the questions clients actually ask us — with real local numbers and the honest caveats. Written by RC Builders Inc, a licensed Monterey County general contractor (CSLB #1081425), not a content farm.
Monterey County ADU Rules: What You Can Build in 2026
If you own a single-family home in Monterey County, the odds are very good that you have the legal right to add an accessory dwelling unit — and the rules are more generous than most homeowners realize.
Read the guideHow Much Does an ADU Cost in California? (2026 Breakdown)
Ask three contractors what an ADU costs and you will get a lowball, a guess, and a shrug.
Read the guideADU Construction in California: The Complete 2026 Guide
An ADU is a complete house in miniature — foundation, framing, roof, plumbing, electrical, kitchen, bath — compressed into a backyard and a year of your life.
Read the guideHow Long Does a Bathroom Remodel Take? (A Realistic Timeline)
The honest answer: a straightforward bathroom remodel takes two to three weeks of construction, a full gut remodel with custom tile takes three to five, and a bathroom that moves walls or fixtures can run six or more.
Read the guideConcrete Driveway Cost per Square Foot — 2026 Central Coast Pricing
On California’s Central Coast in 2026, a properly built concrete driveway costs $10–$16 per square foot installed for standard gray broom-finish concrete, and $16–$28 per square foot for stamped or colored decorative finishes.
Read the guide