The kitchen is where remodeling dollars work hardest — and where a bad contractor costs you the most. RC Builders Inc is a licensed general contractor (CSLB License #1081425) based in Seaside, and we handle kitchen remodels as true design-build projects: one crew, one schedule, one point of accountability from demolition day to the final coat of paint.
Whether you want a straightforward refresh — new cabinets, counters, and backsplash — or a full gut remodel that opens the kitchen to the living space, we manage the entire scope: structural changes, plumbing and electrical rough-in, permits and inspections, cabinetry, tile, flooring, and finish work. We remodel kitchens in Seaside, Monterey, Salinas, Marina, Pacific Grove, Carmel, Pebble Beach, and Carmel Valley.
What a kitchen remodel includes
Every project is scoped line by line, but a typical RC Builders kitchen covers:
- Full kitchen renovation — demolition through finish, including layout changes and wall removal.
- Cabinet installation — stock, semi-custom, or fully custom cabinetry, installed square and true.
- Countertop installation — quartz, granite, butcher block, and solid surface.
- Tile backsplash installation — subway to handmade zellige, with clean layout and tight grout lines.
- Kitchen flooring installation — tile, luxury vinyl plank, and hardwood.
- Plumbing fixture installation — sinks, faucets, pot fillers, and disposal.
- Lighting and electrical — recessed lighting, under-cabinet lighting, and new circuits for modern appliance loads.
- Kitchen islands and peninsulas — including seating overhangs, storage, and electrical.
What a kitchen remodel costs here
On the Monterey Peninsula, a realistic budget for a mid-range full kitchen remodel is roughly $45,000–$90,000. A cosmetic refresh — keeping the layout, replacing cabinets, counters, backsplash, and fixtures — can come in between $25,000 and $45,000, while high-end custom kitchens with layout changes, custom cabinetry, and premium appliances routinely exceed $120,000. Cabinetry is usually the single biggest line item, followed by countertops and labor on tile and finish work.
We give you a written, line-item estimate before any work begins, and we flag the decisions that move the number most — cabinet grade, counter material, and whether walls or gas lines move — so you can steer the budget instead of discovering it.
Do you need a permit to remodel a kitchen?
If the work is purely cosmetic — new cabinets in the same footprint, counters, flooring, paint — most local jurisdictions do not require a permit. The moment you move plumbing, add or extend electrical circuits, alter a gas line, or remove any wall, a permit is required, and pulling one protects you at resale and with your insurer. We handle permit applications and inspections with the City of Seaside, Monterey, Salinas, Pacific Grove, Carmel, Marina, and Monterey County as part of every project that needs them.
How long a kitchen remodel takes
A cosmetic refresh typically runs 3–4 weeks on site. A full remodel with layout changes usually takes 6–10 weeks of construction, plus the lead time for cabinets and countertops before demolition starts — ordering materials before demo is how we keep your kitchen out of commission for weeks, not months. We schedule fabrication and trades so the gap between demolition and a working kitchen is as short as possible, and we tell you the realistic date before we start.
Our work




Kitchen Remodeling services we offer
- Full kitchen renovation
- Cabinet installation
- Countertop installation
- Tile backsplash installation
- Kitchen flooring installation
- Plumbing fixture installation
- Kitchen island construction
- Recessed & under-cabinet lighting
Frequently Asked Questions
Most full kitchen remodels on the Monterey Peninsula run $45,000–$90,000. Cosmetic refreshes that keep the existing layout can come in between $25,000 and $45,000, while custom kitchens with structural changes commonly exceed $120,000. Cabinetry grade, countertop material, and layout changes are the three biggest cost drivers.
Plan on 3–4 weeks for a cosmetic refresh and 6–10 weeks of construction for a full remodel with layout changes. Cabinet and countertop lead times add several weeks before construction starts, which is why we order materials before demolition begins.
Not for purely cosmetic work in the same footprint. You do need a permit the moment plumbing moves, electrical circuits are added, gas lines change, or a wall comes out. We pull and manage all permits and inspections as part of the project.
Usually, yes. Many walls between kitchens and living areas are load-bearing, which means an engineered beam rather than a simple demo — something we design, permit, and build routinely. We assess the framing during the estimate so you know the real scope before committing.
Most clients do. We contain dust with sealed barriers, keep a working path through the house, and can set up a temporary kitchen station with your refrigerator and microwave. The hardest stretch is the two to three weeks between demolition and counters — we plan around it with you.
We handle layout and construction design in-house for most projects and work alongside your kitchen designer or architect when you have one. Either way, you get one contract and one accountable builder.
